Customization: | Available |
---|---|
After-sales Service: | Online-Technical Support |
Application: | Apartment |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name |
Folding Box Houses |
Material | Steel, Sandwich panel |
Color | Blue, red, white & customized |
Model Number | Contanier house |
Fire proof | A1grade Fire proof |
Wind pressure | Anti 100km/h |
The resistant earthquake grade | 7 fission activate |
Used | Carport, Hotel, Kiosk, Booth, Office, Sentry Box, Guard House, Shop, Toilet, Villa, Warehouse, Workshop, Plant, Other |
1. Wide range of application
According to different needs, the packaged box room can be designed into various functional units such as office, accommodation, foyer, toilet, kitchen, dining room, recreation room, conference room, clinic, laundry room, storage room, command post and so on.
2. Safe and durable
The structural strength of the packing box room is tested by the special test bench for mechanical testing. The structural safety can be realized, the seismic level is 8, the wind resistance is 12, the service life is more than 20 years, and the performance of earthquake resistance, pressure resistance, heat preservation, sound insulation, fire resistance, water resistance, snow resistance and wind resistance can be built permanently or semi-water long according to the needs of different regions, different cities and different uses.
3. Industrialization
Large-scale production line - The unit modules that make up the box room are all completed on the streamlined production line in the factory, with standardized size, strict quality control, high production efficiency, and effective control of large-scale production and cost.
4. Easy to move
The packaging box room has good overall performance, convenient movement, and can be well adapted to modern transportation modes such as roads, railways and ships. And the relocation does not need to be dismantled, can be moved together with the box, no loss, can be stored, can also be used repeatedly, both fast and save hunger, and the residual value is higher.
5. Energy saving and environmental protection
Adopting the "factory manufacturing + on-site installation" mode, the project can reduce construction water consumption, concrete loss of about 60%, reduce construction waste and decoration waste of about 70%, energy saving of about 50%, and the overall production efficiency of about 2-3 times. The space formed between the units of different shapes will be used for greening, planting turf or various ornamental plants, pot loading, etc. The rational use of these Spaces will save more land.
6. Diversify your portfolio
Packaged box room gives designers greater flexibility, in a single box as a unit, can be arbitrarily stacked combination. A modular unit can be a whole room or several rooms, or it can be a part of a large room. It can be assembled and combined in any length and width direction, can be stacked in three layers, and can be decorated with modeling roof and terrace.
1.Q: Could you please design a new and unique prefab house for me?
A: Absolutely! We are able to provide you with not only construction scheme, but landscape design! One-stop service is our outstanding superiority with no doubt.
2.Q: What should I provide to build a prefab house?
A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don't have any. Simply notify us your requirements, such as the area, usage and the stories of the house. Before long, you'll possess an amazing design.
3.Q: How could I ensure the cost of building a prefab house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
4.Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 50 square meter house five workers 1-3days finished installation, save manpower and time
5.Q: Is it difficult to build a prefab house?
A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool.
6.Q: Does this kind of house can only be used in residential buildings?
A: Absolutely not. It can be used in all kinds of buildings, such as hotel, office, school, entertainment club, light industrial workshop, etc.
7.Q: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 7-15 days after receiving the deposit.
8.Q: What is your payment terms?
T/T, Western Union, Paypal etc.